Projects

If our people are our DNA than our projects are what defines us. The end result of all the hard work, approach and application of our expertise. With fast-paced growth in the commercial sector, we’re proud of the growing list of projects with Form’s name on them.

THE BRIEF

An ECI arrangement between Form and JACE Industries, providing time, costs and methodology input to build a new 55,000m2 leading-edge packhouse and cool storage facility. The project was split into four stages, with stages one and two scheduled for completion prior to the 2018 Kiwifruit season.

THE BUILD

To build one of the largest Kiwifruit processing facilities in the Bay of Plenty region. Specifically designed for seamless processing of fruit in a fully temperature controlled environment. The first of its kind in New Zealand. The completed project will increase JACE industries capacity to ten million trays of Kiwifruit per season. Stage one and two were large scale builds comprising of hefty figures such as: 850 tonnes of structural steel, 7,000m3 of concrete and a roof area of 17,000m2. Stage one was made up of six pre-coolers, ten coolstores, a loading office, a forklift re-charge room, an MCC room, a plant room, a load out canopy and a four truck load-out dock. Stage two consisted of a bin curing store, bin tip area, eight controlled atmosphere stores, a packing line, office space, cafeteria, mezzanine floor of approximately 3,060 m2 and two industrial lifts. External works consisted of an 8,500 m2 concrete ring road and large car park.

THE OUTCOMES

The project delivery timeframe was extremely tight. Through careful planning and first class management, both stage targets were met, enabling operation of the packing line and coolstore for the 2018 season.  

View similar projects

Bob Rodgers, General Manager, Chempro

“We were impressed with how Form managed the project…Form have a strong commitment to health and safety which was immediately evident…During the entire project all Form staff were professional, easy to work with and always prepared to take the time to discuss how the project was proceeding”

Bob Rodgers, General Manager, Chempro

Read more >

Copyright © 2014 - 2018 Form Building & Developments. All rights reserved | Privacy | Sitemap | Design by Tuskany | Website by MOCA