THE BRIEF

To assist with design and deliver a high specification retirement village.

12 multi-level accommodation blocks interspersed with up to 30 standalone villas in Huapai, Auckland.  The project is being delivered in multiple stages for Cabra & Hoppers in Joint Venture.

 

THE BUILD

The main blocks will have basement parking below, a steel frame structure, double T floors, with a bagged brick cladding. Bathrooms will be provided using pre-fabricated pod units.

Construction commenced in early 2019.

THE OUTCOMES

Various cost saving options have been proposed and considered, with pre-fabricated bathroom pods being the biggest option selected, not only offering cost savings, but consistency of quality and programme savings.

View similar projects

17 Lyon Avenue
17 Lyon Avenue
17 Lyon Avenue

Leon Da-Silva

“It is an unusual situation for a client to work alongside a contractor, however, our team have managed to cohesively progress through all of the usual project challenges. By engaging Form during the pre-construction stage we have been able to minimise project issues and tap into each other’s experience. Form were most helpful throughout the design phase and have carried that through to the day-to-day activities”

Leon Da-Silva, Managing Director, Da-Silva Builders

Read more >

Copyright © 2014 - 2020 Form Building & Developments. All rights reserved | Privacy | Sitemap | Designed by Tuskany | Website by MOCA